Dear train friends,
Thanks for the positive feedback re the rail crossing. It's in and looks good.
The challenge is with contact to the locomotives with the third rail.
The "sleepers" were sand to the minimum. Less than 0.5mm.

That should solve the problem. The glue is setting.

The second rail crossing at the farm is also in. Close up photos to come. I'm reading up on the operator who has to guard the rail crossing.
But in the meantime a small update with maps set up on forest walks. That was fun assembling/glueing miniature laser models.
The box is huge and out popped a small packet the size of a lion matchbox.
Anyway here the assembly pics.